expectations

Comfortable, Happy, Healthy Homes: How To Get To Net-Zero

Cost-effective zero energy homes start with the design. Don't skimp on design if you want the performance without excessive cost.  Nobody, I mean really, nobody, wants to live in a house that they spent hard-earned money building (or buying) and then shell out more money every year just to sit around in three sweatshirts because you refuse to turn the heat up. We want to sit in the warm sunshine, maybe drinking our coffee, reading the newspaper, and not worry about the dollars that are flying out the door. Did your mom ever yell "Do you live in a barn, close the door". Well we don't live in barns, and we don't want to live in drafty uncomfortable spaces either. We want to live in warm, cozy, happy, healthy homes.  So how do we get there?One of the ways we do that is through energy modeling. During the design phase we always run our projects, especially net-zero bound projects, through our energy modeling software. I won't get into the weeds on all the data that goes into an energy model, but I will tell you what we use it for. Doing the energy modeling during the design phase allows us to evaluate different building techniques, heating systems, and performance data to come up with the best solution for your individual needs. The industry calls this technique, cost offsetting. If we can add more insulation to your walls, we can reduce the need for a central heating system. If we can reduce or eliminate the central heating system, the costs of construction go down.  We like to use the term "house as a system" which means your house is a series of inter-related parts. When you change one part, if affects others. By using energy modeling software we can compare different construction techniques to come up with the best combination of different parts.Another cost offsetting technique that we love to use is orientation! So simple, and absolutely free. If we look at history, the ancient Romans knew which direction to face their buildings and how to use mass to absorb heat. Use the sun for passive solar gain, brilliant! Modern day building practices have almost completely ignored this one simple solution. In addition to orienting the house the right direction (south) we also take time to place windows to take advantage of the view while at the same time, eliminating windows where we don't need them. If we can cut down windows on the north side of the house, the performance of the home skyrocket. That doesn't mean we live with dark spaces. One of my favorite solutions to fewer windows is interior windows. A great way to add character and style to a house is to pick an old window and install it in an interior wall between a room with lots of natural light and one with low or no daylight. This is especially effective for lighting interior stairways without adding skylights to the roof. If you've been following my blog or know me in person, you've probably heard me say "windows never pay for themselves". So why pay a lot of money for a poor performing building material instead of spending time during the design process to pick and place the right window in the right location. Should you order triple pane windows from Poland? Maybe? Should you take the time to maximize windows in the best locations and eliminate them where not needed? Absolutely! Can you hit Net-Zero with builder grade double pane windows from a major window manufacturer? Yup! Are you starting to see the forest through the trees? Getting to 0 from 100 is all about design.To get all the way down to 0 though, you have to produce as much energy on your site as you use. We can super insulate the building, eliminate thermal bridging, reduce air infiltration, orient the house the correct way, but what we can't do is completely eliminate energy use. So we need to produce energy on site to offset the usage. If we oriented the house the correct direction, adding solar panels is usually the quickest and easiest on site power generator available.  Some people, depending on location, may be able to harness wind power or hydro, but the average homeowner should be able to take advantage of PV. With the government subsidizing solar installations it's getting more cost-effective to add your own power generation to your home. Between off the grid battery banks and grid-tied net metering, there is a way to harness the power of the sun to produce electricity.If you're reading this article and thinking "but all these super efficient houses are ugly" you should go back and read one of my previous blog posts on selecting the right architect. We all have different taste, and if you select the right architect for your project it can be cost-effective, efficient, and beautiful. And here you thought building a house was simple, little did you know it's one of those giant jigsaw puzzles, that until you get all the parts lined up just right, you just have a pile of building materials that may or may not turn into a happy healthy home.There are lots of different ways to get to zero energy. So like I said at the very beginning, spend time during the design to get all the details right.  You can simply monitor your actual energy usage for a year and prove that you made more energy then you used. Or you can take advantage of one of the certification programs out there for meeting the zero energy threshold. Here are a few:ProgramsLiving Future Institute: Zero Energy Building CertificationDepartment of Energy: Zero Energy Ready HomeNYSERDA Net Zero Energy Homes Low Rise New Construction ProgramLEED Zero Net Energy HomesIf you read this article and you're disappointed I didn't tell you exactly how to get to net-zero with all the tech trade industry specifics, feel free to reach out to me via email. I'm always happy to get into the weeds on how the technologies work and how they can be combined. All you need to do is run into one of my past students to know, I love to talk about this stuff! So reach out, leave me a comment, send me an email, start a discussion with me on Facebook. I promise, I'll respond!~ Emily Mottram, Mottram Architecture

5 Reasons Why We Think You Should Stop Putting Your Projects Out To Bid!

Kitchen & Bath Renovation-06-6Call us crazy, but putting projects out to bid is our least favorite thing to do, and here is why.

Bids are never apples to apples

When you put a project out to bid, the architect has to provide a lot more information to ensure that all the contractors are bidding the same thing, which they never are. We know from experience, if you ask 6 contractors how to build something, all 6 will have a different way of doing it. Taking the lowest bid can sometimes mean that your going to get an inferior product or maybe a subcontractor whose attention to detail isn't quite where you'd expect it to be for the money you are spending. When the contractor isn't intimately involved in the project they don't know what your expectations are. I once asked a client's rep if the client was a Volvo or a Ferrari, because it makes a difference in the level of detail and the quality of what you provide. You may also be ruling out the best contractor for your project based on price alone. In the long run, the more expensive contractor may have been better able to meet your needs and may have lost of job because they were not willing to compromise the integrity of what they do to win a job.

You spend more money with your architect on things that could potentially be spared

As I mentioned above, the amount of information that needs to be provided during the bid process can sometimes be significantly more than what would be needed if you were working with a contractor that the architect has already worked with. Having a contractor who has been involved in the process from the beginning and knows that you want a specific type of wide plank hardwood flooring will help get accurate pricing.  Often times a contractor will leave an allowance for things like light fixtures, flooring, plumbing fixtures etc. These allowances are based on either their experience, or whatever is the easiest and cheapest thing available to keep their bids low and be awarded a project. That doesn't mean that you will select these products, and in the end, you may be over the budget you had agreed to because this contractor didn't know you wanted all LED fixtures, or that special faucet from Waterworks.  As the architect, we will try to pack as much as possible into the design drawings and specifications to catch all of these variables, but it's simply not the same as the builder getting to know you during the process so they know what to bring to the table to meet your specific budget and requirements. Of course we want to be involved in your project from beginning to end, and we will help you with all of your choices and selections, but adding unnecessary time to a drawing set to get accurate bids is sometimes a waste of our time and your money.

The lowest bid rarely nets you the best project

We've worked on several projects where contracts have to be awarded to the lowest bidder, and it's always a challenge. When the client doesn't know, like, or trust the contractor, there is always second guessing through the entire project and it can become a very adversarial relationship. You will be spending several days a week, for several months of the year, with this contractor who is building on renovating your dream home. Knowing that your personalities will click can be worth a few extra dollars! Having the peace of mind that the contractor will pay his subs on time and won't take your deposit and skip town is huge. Knowing that the contractor understands your objectives and can easily bring cost effective value engineering to the project without losing sight of your final vision is crucial. But the reality is, building a home is a very complicated process and you want a contractor by your side who is going to listen to you, handle the details, and be kind and respectful through out the project.

Building a team gets you a better end result

We know we aren't perfect, and training to be an architect often requires you to work as part of a team. We love the integrated design process, both between ourselves in the open design studio, and with the contractor, client, and specialty trades. Building net-zero homes is a team effort and we think you get a much better project when the entire team pulls together the project from the beginning.  As I mentioned above, no two builders are going to build something the same way so why put a wrench in the system.  Sit down with the contractor and go through how they would build it, what ways they can bring cost savings to the project, and how to meet your objectives in the best possible way.  Planning for things like, where the solar lines are going to run from the roof to the utility room, can make or break a project. Making those decisions made during the design phase helps create a truly cohesive project. Having a different set of eyes on the plans as they come together, in our opinion, always creates a better solution.  Architects are trained to get the most out of your space and your budget. We think in three dimension as the plans are going together.  But we also love to work closely with our builders because they know how they are going to put together what we are asking for, and they are always up on current market fluctuations in pricing and schedule, so they have a thumb on the pricing throughout the project and can make cost effective recommendations that help keep the project on time and on budget.

Putting a project out to bid could blow your schedule out the window

Although the last of our 5 recommendations, it is in no means the least important.  The last couple projects I have put out to bid have all had the same problem. The client has finished with design and they are excited about the project only to find out that all the contractors that we have approached to bid on their project are out 3, 6, or 12 months.  Securing a contractor so you can start your project when you're ready to get started can be critical. When you put a project out to bid you are at the mercy of the contractors schedule.  When you bring a contractor in, early in the design process, they will add you to their schedule and be prepared to start your project at the agreed upon time.  Getting everything together in time for construction then becomes something the team works very hard to make happen.  If you put a project out to bid, even if you land the contractor you know you want to work with, you may need to wait several months to get started. So when you start a project, be clear about your timeframe. If you're building on the lake or ocean, sometimes the towns have rules about when you can do construction, and it may not be during the time of year that is best to build.  If you're not already on your contractors schedule, that could mean you have to wait a whole year to build.  In Maine, depending on the time of year, roads get posted which do not allow construction vehicles to travel to a site for many weeks. Timing is crucial and holding a contractor to a bid for more than 90 days is unlikely.  The fluctuation in the product market can be huge. Between the end of December 2015 and the end of January 2016 one of our window manufacturers increased their pricing twice.So our recommendation is to stop putting your project out to bid! Select a contractor that you know you can work with.  Tell them your budget, bring them in on the team, and let them plan for working with you and provide value engineering to your project to keep it on time and on budget!

What's The Process For Working With An Architect To Design My Home?

What do I get for my money? Are you worried about working with an architect but have no idea what to expect? Well here is a detailed layout of how a typical project can be structured when working with Mottram Architecture. What do you get for your money? Value! Sure, I’m trying to sell you something that doesn’t exist and below is a list of the meetings and items I will provide to you during the course of a project. But what am I really providing?You might ask yourself:Do I need to hire an architect?Nope! Homes are built every day without an architect. Building a home is a complex problem and we (as architects) thrive on those challenges. Isn’t your dream home a space that suits you exactly? Do you live in a home that you have been trying to reconfigure for your family's specific wants and desires? These are custom solutions that we can help you solve. Hiring an architect is about managing your risk through a complex construction project, and increasing the quality of your experience during the process and for years after as you live in your home.A project typically takes a natural progression that almost all architects follow. We work in a similar manor and this is the breakdown of how we work. Every client is different, however, and we give you the opportunity to take advantage of as many phases as you’d like. We also realize that this process is based on the average client and we may spend more time with you in different phases. Every client is unique and we adapt our proposals to meet your needs.Phase I is an existing conditions survey, or it's schematic design if you are building new. What happens in the schematic design phase?We meet to discuss your goals and establish the project requirements including the Project Scope, budget, space requirements and aesthetic preferences.Based on the requirements established at the first meeting, we sketch out a design comprised of up to three proposed solutions for the project. Solutions usually include floor plans and exterior building elevations to illustrate the home.After discussion of the first three design concepts, we have an additional meeting to present and discuss the combinations of all of the design solutions into one solution moving forward. Usually we provide two revisions to the selected schematic design solution.  More than two revisions during the schematic design phase could be considered additional services and can change the overall cost of the design proposal. Again, this process is based on your average customer.At this phase we provide a “design” budget using square footage cost estimation and the schematic design solution will be signed off on prior to moving to the next phase of design.Phase II, What happens during the design development phase?With your approval of the schematic design we get a lot more detailed! We will develop the floor plans, exterior elevations and prepare additional details to fix and describe the character of the project.You will now need to start thinking about and seleting hardware, finish plumbing fixtures, appliances, kitchen cabinets, tile, stone and decorative lighting fixtures. Depending on the project we typically prepare interior elevations as necessary to describe the locations and arrangements of fixtures and finishes that you have selected.As a rule of thumb, we usually meet once at the beginning of design development and once during the process. This translates to 2 design revisions prior to heading into construction documents where we tell the builder how it all goes together.Phase III: What happens during the construction document phase?Based on the approved design development drawings, we prepare construction documents consisting of drawings and specifications that will describe the scope of work and be suitable for filing with the building department and for construction by a qualified contractor.This is the part where we, as architects, spend a lot of time at the drawing board putting together all the details. We meet less frequently, and what is provided is a substantial set of construction documents that can include, but not be limited to:

    • Architectural Floor Plans delineating the existing construction, demolition, new construction, and the cross referencing of details and sections on subsequent drawings.
    • Power and Data Plans showing electrical receptacles, telephone, cable and internet locations.
    • Finish plumbing fixture locations.
    • Reflected Ceiling Plans indicating placement of ceiling-mounted, wall-mounted and recessed lighting fixtures, with associated switching arrangements, and locations for required smoke and carbon dioxide detectors.
    • Building Elevations at each exterior facade showing the existing residence with the proposed new construction including notes indicating finishes, materials and any special conditions.
    • Details, Sections, Schedules and Notes communicating, in detail, different aspects of the design relating to construction and/or code requirements. These details are essential in conveying the design concept to the General Contractor, the subcontractors and to the Building Department.

Engineering Note: Basic Architectural Services do not include mechanical, electrical, plumbing, fire suppression, structural or civil engineering. Phase IV: What happens in the pricing and permitting phase:We should qualify that we will help with putting a project out to bid as noted below, however, we find that our clients are more satisfied with the overall construction project when they select a contractor during the design phase and bring them into the process creating a truly integrated design. This almost always saves time and money for the homeowner.Contractor SelectionWe will assist you in interviewing (3) contractors of your choosing or if you need some contractor referrals we know several people in different geographical locations that would be happy to talk with you about your project.We coordinate with the contractor during the design development and construction document phase to reduce design fees and meet the clients scope and budget. We work closely with the Contractor to value engineer a project to meet within the constraints of your scope and budget and revise the design accordingly.Bid CoordinationIf you choose to put the project out to bid we will assist you with assembling, distributing and evaluating the bid package, which includes things like preparing and distributing the Construction Documents to each contractor. Addressing contractors questions and issuing clarifications and/or addenda (as required). Assisting you with the evaluation of the bids, as it needs to be reviewed to be sure each contractor is bidding apples to apples.Building Permit AssistanceWe will assist you in preparing the application for the Building Permit as required by the local zoning code. We will make sure the drawings include all the necessary elements for permit along with any other paperwork you might be required to submit. Fees associated with the Application for Building Permit are the responsibility of the Client.Phase V: What happens during construction administration?Based on the signed contract between you and the contractor of your choice, we can provide a number of services during construction!We prefer to start construction off with a project coordination meetings just to be sure the client and the contractor are on the same page! This helps to provide clarification of construction documents.If you need us to, we will visit the project site at regular intervals to observe the progress of the work and answer any questions the contractor might have. When you are dealing with renovation projects you should know that something always comes up during construction.On larger projects we review subcontractors’ submittals such as shop drawings, product data and/or samples. Sometimes that means we might prepare supplemental and clarification drawings during construction to meet the requirements of your project.At substantial completion, the Architect shall prepare a “punch list” of work to be corrected and review the corrective work to completion. It's always that last 5%.We give our clients a proposal after our first meeting that details these steps with our understanding of their scope of work. At any time a client can choose to move forward to the next phase, or only complete the current phase.  We like to think we make architectural services available to everyone. We think we add value to every project, so we'd like you to give us the opportunity to prove our worth!~ Emily Mottram, Mottram Architecture

What Does A Homeowner Need To Know When Building Their Own Home? An Interview with Karen

As 2015 ended and 2016 took off soaring, I sat back to think about what my clients, future clients, and every homeowner might like to know about building their own home. As the Architect, I'm here to help you every step of the way with charts, lists, project schedules and whatever you may need.  However, I think it's just as important to hear it from my clients.  So I sat down with one of my current client, Karen, to get her feedback on the process of building her own home.How many builders did you interview before you selected your current builder?"One!" Karen had intended to interview three different builders.  She got referrals, asked her friends, and had every intention of being her own general contractor for the projects.  She thought, with her connections, she could get great pricing and save money.  When her excavation contractor, who she knows, likes, and trusts, recommended a builder to her she thought, why not, let's hear what he has to say.  Karen says "He pulled into my driveway and starts  chatting with me. I immediately tell him that I want to GC my own project because I'm well connected and I know people.  To which he responded that he too knows people, and because he does repeat business with them, they give him even better pricing.  When I found out he could do the project as the GC for the same price that I could I was shocked. And it turns out he was right. I had friends in the trades that I thought would help with our project that never even called me back to give me a bid. It simply isn't worth their time for a one-off project. Honestly I don't even think we made it into the house. We talked for 10 minutes and I hired him on the spot without ever seeing his work. When you know your supposed to work with someone, you just go with your gut. I never interviewed another builder".What's so great about working with this builder?"As I mentioned, I wanted to GC my own project.  So I went to the builder with spreadsheets and cut sheets on everything I wanted.  Then he explained to me his perspective with other clients as we moved through the process. There were definitely glitches during the project, but my husband and I try not to sweat the small stuff.  We either fixed it if we could, or we lived with it and let go of it if we couldn't. Communication is definitely key" And from experience I can tell you that Karen and her husband are constantly on site, just like every homeowner will be with their project.  In Karen's words. "There needs to be an established trust.  You need to pick someone you can work with and he was willing to work with me"What has been the hardest struggle with building your own home?"Hmm, that's a tough one. It's all gone so well.  I guess that I wanted to be in by December 31st.  Everything was ahead of schedule and under budget, but now that we are getting down to the finish level we have had coordination issues.  The doors were backordered and won't come in for 6 weeks, but then we couldn't complete other finish details without the doors and that's when the schedule went right out the window.  When something doesn't get installed on schedule it affects other pieces of the puzzle. When other trades can't come in on the scheduled date you get bumped to the back of the line.  Our contractor is actually finishing today and going to another job.  He'll be back to finish the finish carpentry when the doors come in"What's you're advice for other homeowners who might deal with a similar situation?"Add 4 weeks to your move in date just to be safe.  And be realistic. I know my contract says December 31st, but I'm not going to hold my builder to that when this delay was out of his hands. Lots of things happen that are out of your control"What other advice would you give to homeowners? "If you're building on your own property check your homeowners insurance will cover the cost of the new build especially if you're financing it yourself. I woke up one night with a near panic attack that the new house might burn down. I called the insurance agent and had coverage the very next day. When I checked what our homeowners insurance covered it was only 3/4 of the cost of the build. Also, make sure everyone signs lien waivers so you're covered in the event of an incident. And on top of that, document every conversation so when someone gives you a quote and it comes back double you can say: What changed here? I kept a little journal though the whole process." said Karen.  As an Architect I often follow up meetings with my understanding of the scope and the next steps.  This helps to reduce confusion and gives everyone a hard copy to go back to incase there is a discrepancy.  I don't believe it is legally binding, but it's a great paperwork trail to figure out how you ended up somewhere.What was an interesting piece of advice that someone shared with you during the process?"I thought it was funny at the time, but someone told me: When you pour the foundation it will feel big, then when you frame the walls it will feel very small, but then when you put up the drywall the space will feel big again, but then you'll paint and it will feel really small, but when the furniture comes in and fills the space it will feel just right if you planned it right.  I thought that was unique, but it was definitely true during the build"What last words of wisdom would you give to other homeowners?"Building should be fun! It's the single largest investment you're going to make and you're going to spend a lot of time with the individual you picked to build your home.  So make sure you pick someone you can work with.  And lastly, this is your dream, do it with a grateful heart. You have a opportunity that lots of other people never will, so be grateful."

72% Of Individuals Polled Were Unaware That Architects Apply For Planning Permission

Sadly, I have neglected my blog over the last couple of weeks as mud season rolled into road construction season here in Maine.  I have, however, kept up with some of the interesting articles that are floating around my inbox.  One that caught my attention stated a number of facts that the average person doesn't know that an Architect does! Architects are notoriously bad business people. How can we run a successful business if the majority of individuals who would hire us have no idea what we do!This topic reminds me of the statement that I make to my students at the beginning of each semester. "I don't know what you don't know!” Quickly followed by: “I don't remember what it was like when I didn’t know, now that I know it.” As an Architect, I guess I get caught up in the excitement of the design of the project, and I forget to explain all the important things that need to happen behind the scenes as a project develops.According to Vitruvius who wrote The Ten Books On Architecture for the emperor Augustus: “The architect should be equipped with knowledge of many branches of study and varied kinds of learning, for it is by his judgment that all work done by the other arts is put to the test.” The foundation for which all architects study asks them to be the linchpin for every project. In simple terms it requires the architect to hold together various elements of a complicated process:  To be involved in every aspect of design and construction because an architect's knowledge base extends to every discipline.I am currently writing a class for the fall semester and I have to put together, in detail, a worksheet of all the information that an architect would be required to figure out during each phase of the design and construction process. It has been an exhausting list including zoning, watershed, ADA compliance, wall detail sheets, sections, schedules and so much more. Maybe you don't need the Architect to hold your hand and pick out paint colors, but are you aware of all the other things you should be asking your architect to do? How about a few ideas to get your mind thinking about how complicated this process is:

  1. Check the zoning, because what happens when you can’t do what you wanted to do on your site?
  2. Check for watershed restrictions, how much extra is it going to cost you to find the right location for the septic on this site you wanted to build on?
  3. Phosphorus plans. Did you even know you might need one of these?
  4. Planning requirements for submission, every town is different and you might need stamped engineering drawings or a site plan with 2’-0” contours.
  5. Help the builder work out any unforeseen issues, because there will always be issues
  6. Coordinate with trades, when you have no data jacks on the first floor of your home and you can’t connect to the internet without a wireless router you’ll wonder why no one said anything. It’s not like you were supposed to know, and the electrician was just doing whatever was necessary for a certificate of occupancy, it's really not their job to ask you how you are going to use your space.
  7. Lighting, because even the most beautiful space can be dark and under utilized if a proper lighting layout hasn’t been established
  8. Check to make sure the building envelop is tight and continuous, the days of energy efficient structures are becoming more and more important.
  9. Verify the electrical is in a usable location, because there are twenty light switches and not one of them turns on a light when you enter the front door.
  10. Heating or cooling is in a usable location, because it was easier to run ductwork right behind where your couch will go, and now it doesn’t heat the space.

I assume it was drummed into my mind as a young architect that our clients don't need to know all the nitty gritty of what we do behind the scenes.  However, it has become abundantly clear, that our profession is marginalizing itself because clients now assume that the builder figures out things that architects should be doing. Whose fault is it when we agree to lesser services and the project doesn’t go as planned? Just because the structure can be eight feet apart, doesn't mean that the geometry will look correct when it's finished. Or that removing one window will save you $500, but now every time you drive into your driveway you see the two eyes and mouth because the front of your home looks like the painting "The Scream" by Edvard Munch. It's like trying to run a project, without a project manager. Just because it might save you a little money, doesn't mean it's always a good option.  The architect has spent hours getting the proportions just right, so if you need to save money, or make a change, they need to be able to evaluate how that change will affect all other parts of the structure. Not only does the architect design buildings, we manage the process from the beginning site analysis through commissioning.  You need the architect to be fully engaged through the entire process, so let us tell you why you need us!